Enter the password to continue
Select every discipline being requested for this proposal — this drives which scope language gets pulled into the draft. Multiple selections are fine. Select disciplines before uploading the architectural PDF, since the drafted opening paragraph is written for the discipline(s) selected at upload time.
Upload the architectural PDF so the AI can pull project details automatically. Fields it finds will auto-fill Sections 3 and 4 below — please confirm everything before submitting.
Drop the architectural PDF here, or click to browse
PDF only · extraction runs automatically once uploaded
Per Jon — fee structure adjusts depending on which format the architect provides.
Matches the Attn/Ref block at the top of the proposal. Confirm/edit anything the PDF extraction pulled in.
Square footage by area — used for the project-understanding paragraph and fee calculation.
Populated automatically when the architectural PDF is processed. Edit freely, this is what goes into the proposal's opening section, it does not replace your review, just gets you a starting draft.
Client-specific — confirm during the call, don't assume. Only applies when a fire sprinkler discipline is selected above.
Anything from the call that doesn't fit above — site conditions, preferences, timeline.